Installation Procedures
Prepare the Site
Before you begin installing the hub, prepare the installation site. Make sure your operating environment meets the operating environment requirements of the equipment.
Characteristic | Requirement |
|
|
Temperature | Ambient temperature between 0° and 40° C (32° and |
| 104° F). |
| No nearby heat sources such as direct sunlight, warm air |
| exhausts, or heaters. |
|
|
Operating humidity | 90% maximum relative humidity, noncondensing. |
|
|
Ventilation | Minimum 2 inches (5.08 cm) on all sides for cooling. |
| Adequate airflow in room or wiring closet. |
|
|
Operating conditions | At least 6 feet (1.83 m) to nearest source of |
| electromagnetic noise (such as photocopy machine or arc |
| welder). |
|
|
Service access | Minimum 12 inches (19.68 cm) front and back for service |
| access and maintenance. |
| Front and back clearance for cables and wiring hardware |
| such as punchdown blocks. |
|
|
Power | Adequate power source within 6 feet (1.83 m). |
|
|
Wiring hardware | Wiring hardware, such as punchdown blocks or patch |
| panels, should be complete before installing the hub. |
|
|
Installation
Place the Model FE116 hub on a flat surface or mount it on a wall with the hardware included in the wall mount kit. Be sure the hub is positioned with at least 2 inches of space on all sides for ventilation.
Connecting Devices
You can connect any device equipped with a
To connect any of the