Installation Procedures

Prepare the Site

Before you begin installing the hub, prepare the installation site. Make sure your operating environment meets the operating environment requirements of the equipment.

Characteristic

Requirement

 

 

Temperature

Ambient temperature between 0° and 40° C (32° and

 

104° F).

 

No nearby heat sources such as direct sunlight, warm air

 

exhausts, or heaters.

 

 

Operating humidity

90% maximum relative humidity, noncondensing.

 

 

Ventilation

Minimum 2 inches (5.08 cm) on all sides for cooling.

 

Adequate airflow in room or wiring closet.

 

 

Operating conditions

At least 6 feet (1.83 m) to nearest source of

 

electromagnetic noise (such as photocopy machine or arc

 

welder).

 

 

Service access

Minimum 12 inches (19.68 cm) front and back for service

 

access and maintenance.

 

Front and back clearance for cables and wiring hardware

 

such as punchdown blocks.

 

 

Power

Adequate power source within 6 feet (1.83 m).

 

 

Wiring hardware

Wiring hardware, such as punchdown blocks or patch

 

panels, should be complete before installing the hub.

 

 

Installation

Place the Model FE116 hub on a flat surface or mount it on a wall with the hardware included in the wall mount kit. Be sure the hub is positioned with at least 2 inches of space on all sides for ventilation.

Connecting Devices

You can connect any device equipped with a 100BASE-T Ethernet interface to the RJ-45 ports on the Model FE116 hub. These standard RJ-45 ports accept either 2-pair or 4-pair Category 5 UTP cable (100BASE-TX networks require only 2-pair wiring). The RJ-45 interface is an 8-pin connector.

To connect any of the RJ-45 ports on your Model FE116 hub to a PC, use a regular straight-through UTP cable. If you are connecting using Port 16 on your hub, set the Normal/Uplink push button to Normal.

M-FE116NA-1 QCARD

Page 6
Image 6
NETGEAR FE116 manual Installation Procedures Prepare the Site, Connecting Devices