New Buck Corporation 42ZCBB dimensions Clearances, Installation Instructions, Top View, 66-1/8”

Models: 42ZCBB

1 22
Download 22 pages 12.06 Kb
Page 12
Image 12
CLEARANCES:

INSTALLATION INSTRUCTIONS FOR MODEL 42ZCBB OPTIONAL WOODEN FLUSH MOUNT MANTEL FRONT (FF) (KIT#PAKDM42ZCBBFF)

“NOTE: Follow the framing instructions on page(s) 6 & 7. With the exception of the placement of the 42ZCBB in the framed opening . The 42ZCBB must be placed with the front surface of the appliance 1-9/16” out from the finished wall. This well allow the FF to set flush with the front of the 42ZCBB”.

CLEARANCES:

1.Sidewall Clearances: Clearances from the side of the firebox opening to any adjacent combustible wall should not be less than 7". (See page 8, figure 4)

2.Ceiling Clearances: The ceiling height should not be less than 42" from the top of the firebox opening.

INSTALLATION INSTRUCTIONS:

1.After removing the FF kit from its packaging follow any pre-installation instructions provided with the kit.

2.Place the FF over the front of the 42ZCBB, centering the opening in the FF left to right with the 42ZCBB front.

3.Next you must secure the FF to the finished wall surface. You may use “L” brackets, screws or finishing nails (not provided with the FF).

NOTE: If an unfinished FF kit is used, do not operate the appliance while finishing the wood or be- fore the finish has dried properly.

TOP VIEW

REV. DATE

BY

D

 

 

42ZCBB

FINISHED WALL FACE

 

 

6”

66-1/8”

 

 

 

49-1/2”

59-1/8”

FRONT VIEW

42ZCBB & FF FRONTS ARE FLUSH.

1-9/16”

42ZCBB

SIDE VIEW

10

Page 12
Image 12
New Buck Corporation 42ZCBB dimensions Clearances, Installation Instructions, Top View, 66-1/8”, 49-1/2” 59-1/8” FRONT VIEW