Nexus 21 TH52 operation manual Installation includes 6 major steps

Models: TH52

1 36
Download 36 pages 47.58 Kb
Page 8
Image 8

Sea Data Set TH52

English

2 Installation

The installation includes 6 major steps:

1. Read the installation and operation manual.

2. Plan where to install the WSI-box, transducers and instruments.

3. Run the cables.

4. Install the WSI-box, transducers and instruments.

5. Learn the functions and calibrate your system.

Before you begin drilling ... think about how you can make the installation as neat and simple as your boat will allow. Plan where to position the transducers, Server and instruments. Think about leaving space for additional instruments in the future.

A few ”do not” you should consider:

Do not cut the cables too short. Allow extra cable length at the Server so it

can be disconnected for inspection without having to disconnect all attached cables.

Do not place sealant behind the display. The instrument gasket eliminates the need for sealant.

Do not run cables in the bilge, where water can appear.

Do not run cables close to fluorescent light sources, engine or radio transmitting equipment to avoid electrical disturbances.

Do not rush, take your time. A neat installation is easy to do.

The following material is needed: Wire cutters and strippers.

Small and large Philips and small flat head screw driver. Hole saw for the instrument clearance of 63 mm (2½"). Hole saw for the transducer of 51 mm.

2.8mm drill for the WSI-box mounting screws 5 mm (1/4") drill for the mounting holes. Plastic cable ties

If you are doubtful about the installation, obtain the services of an experienced technician.

7

Page 8
Image 8
Nexus 21 TH52 Installation includes 6 major steps, Following material is needed Wire cutters and strippers