FIGURE 2

ASSEMBLY AND OPERATING INSTRUCTIONS

Hoist Set-up

WARNING! Unplug the Hoist before set-up.

1.This Hoist is designed to be attached to a beam or steel pipe and bed securely held in place by both of the Hangers (#23). See FIGURE 2.

Note: The beam or steel pipe must be capable of carrying several times the weight of the Hoist and its designated maximum capacity. If in doubt, consult a registered engineer and building code.

Note: Make sure the area underneath or around the Hoist is clear of obstructions. Do not Hoist loads over people or animals.

2.After determining the location of the Hoist, make sure the beam or pipe is the proper size to fit inside of the Hangers (#23). Have a second person hold the top of the hoist flush against the beam or pipe. Line up the holes on each Hanger (#23) with the holes on the top of the Hoist. Thread in the two Screws (#21) and Washers (#20) per Hanger (#23) to secure the Hoist to the Beam or Steel Pipe. Check that it is secure. Before each use, check that the Hangers (#23) are securely fastened to the Hoist.

3.Ideally, the Hoist needs to be set-up within a reachable distance to a 3- prong power outlet without the need of an extension cord. However, extension cords are safe and acceptable when properly used.

PAGE 10

Page 10
Image 10
Northern Industrial Tools 142260, 142262, 14230 operating instructions Assembly and Operating Instructions, Hoist Set-up