INSTALL DUCTWORK |
| WIRING DIAGRAM |
CAUTION - BEFORE CUTTING HOLE IN CABINET FOR DUCT- WORK: Check for interference with floor joists, wall studs, electrical wiring or plumbing.
BLOWER
SCREWS
TO 6" RD.
TRANSITION
COLLAR
6" RD.
ELBOW & DUCT-
WORK
INSTALL COOKTOP
1.Align the cooktop with the downdraft and fasten cooktop in place.
1.Cut hole in cabinet as well as holes in wall or floor as necessary.
2.Mount the roof or wall cap and work back towards the cabinet, attaching all ductwork, elbows and transitions as previously planned. Tape all ductwork connections to make them secure and air tight.
3.Connect ductwork (and transition, if required) to downdraft. If necessary, LOOSEN nuts and screws that hold the blower in place, and slide blower left or right to meet ductwork. Re- tighten screws and nuts.
Note: A
INSTALL ELECTRICAL WIRING
1.Mount a standard wiring box, with
2.Run appropriate power cable into cabinet and connect it to receptacle.
3.Plug the downdraft’s power cord into the outlet.
Note: Accurate alignment of cooktop and downdraft is necessary to ensure that there is no interference when air vent is raised and lowered. There should be a gap of
ADJUSTMENT
The downdraft is
To adjust position of activating switch:
WARNING: To avoid possible electrical shock, personal injury or death - Disconnect electrical power.
1.If downdraft is plugged into electrical outlet, unplug it.
2.Lift air vent straight up and cock it slightly so it remains in the UP position.
SWITCH
MEMBRANE
| SCREWS |
SWITCH | SWITCH |
BRACKET | COVER |
3.Remove switch cover from right end of air vent.
4.Loosen the 2 screws holding the switch bracket in place. Position switch bracket so that activating switch just comes in contact with underside of switch membrane. Tighten screws.
5.Replace switch cover, gently lower air vent into chimney, and plug in power cord.
4operation.