NuTone 8814R Installation In A New Construction Site, Mounting The Housing, Wiring, Preparation

Models: 8814R

1 10
Download 10 pages 60.64 Kb
Page 2
Image 2
INSTALLATION IN A

INSTALLATION IN A

NEW CONSTRUCTION SITE

PREPARATION

Refer to Figure 1.

1.To remove blower/power unit assembly from housing:

A.Unplug power unit.

B.Remove screw (located next to plug-in receptacle) which holds blower/power unit mounting plate in place. Save screw.

C.Lift mounting plate at end near the plug-in receptacle until blower wheel clears the scroll.

D.Remove plate by pulling its tabs out of slots in housing. Set blower/power unit aside until needed.

2.Remove one of the wiring knockout from housing.

MOUNTING THE HOUSING

Mounting Using Mounting Tabs

Refer to Figure 2.

1.Locate fan housing next to ceiling joist.

2.Use wood screws (not provided) to loosely attach the housing to ceiling joist through the keyhole slots in mounting tabs.

3.Adjust housing so that it will be flush with finished ceiling. For the grille to fit properly, housing’s rim must not extend beyond finished ceiling surface.

4.When housing is properly adjusted, tighten screws in slots.

Mounting Using Hanger Bars

(Hanger bars sold separately, order model HB4) Refer to Figure 3.

1.Insert hanger bars in slots provided in housing.

2.Locate fan housing between joists so that the bottom of the housing is even with the planned finished ceiling. Extend the hanger bars to the joists.

3.Use screws or nails (not provided) to secure hanger bars to ceiling joists.

INSTALLING THE DUCTWORK

1.Refer to Figure 2. Place duct collar over flanges at discharge opening of fan. Secure collar by snapping tabs into slots in flanges.

2.Run 4" round duct from outside to fan's discharge opening.

3.Connect duct to fan's duct collar.

WIRING

All wiring must comply with local codes and unit must be properly grounded.

1.Run 120vAC house wiring (with ground) from wall switch to fan location.

2.Pull wire through access hole and into junction box.

3.Refer to Figure 4. Use approved wire nuts to connect house supply wires to fixture wires as follows: white to white; black to black. Connect green or bare ground wire to green ground lead.

POWER/BLOWER UNIT INSTALLATION

1.Place power/blower unit into housing so that mounting plate's tabs insert into slots in housing.

2.Press other end of mounting plate down until it is firmly seated over scroll and plug-in receptacles.

3.Secure mounting plate to housing with provided screw.

4.Insert motor plug into junction box receptacle.

FLANGES

DUCT

COLLAR

 

 

WIRING

 

KNOCKOUTS

 

MOUNTING

 

TABS

 

FIGURE 2

HANGER BARS

(SOLD SEPARATELY)

FIGURE 3

JUNCTION BOX

GREEN

GROUND

LEAD

STANDARD WALL SWITCH

 

 

 

 

 

 

 

 

 

(NOT INCLUDED) OR

 

 

 

 

 

 

 

SWITCH

OPTIONAL NUTONE

 

 

 

 

 

 

 

 

BOX

SPEED CONTROL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120vAC, 60 Hz

 

 

 

 

 

EARTH GROUND

HOUSE POWER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FIGURE 4

Page 2
Image 2
NuTone 8814R Installation In A New Construction Site, Mounting The Housing, Installing The Ductwork, Wiring, Preparation