NuTone QT150 Installation Existing Construction, Grille Installation, Maintenance

Models: QT150

1 8
Download 8 pages 34.59 Kb
Page 3
Image 3

GRILLE INSTALLATION

1.Refer to Figure 8. Compress grille mounting springs and insert into slots in the housing.

2.Press grille firmly into place against ceiling.

MAINTENANCE

WARNING: Risk of fire or electrical shock; disconnect the power before cleaning or performing any maintenance on the ventilator.

If the grille becomes soiled, use only a mild soap and water solution for cleaning. Do not use solvents or abrasive cleaners.

INSTALLATION IN

EXISTING CONSTRUCTION

Installing a ventilator in an existing construction site requires at least a small accessible area (attic or crawl space) above the planned installation location.

Review “INSTALLATION IN A NEW CONSTRUCTION SITE” and follow all instructions which apply to your installation.

LOCATION: Locate ventilator next to a ceiling joist.

WIRING AND DUCTING: Refer to Figure 6 for wiring and

to Figure 2 for ducting. Plan ducting and wiring before proceeding with installation.

CAUTION: Check the area above the planned installation to be certain that:

1.Ductwork can be installed.

2.Wiring can be run to the planned location.

3.No wiring or other obstruction will interfere with the installation.

INSTALLATION FROM ACCESSIBLE AREA ABOVE (using headers)

Refer to Figure 9.

1.From below the installation site, drill a small hole in ceiling at the planned location. Stick clothes hanger through hole to help locate it.

2.Locate hole in attic or crawl space.

3.In attic or crawl space, mark ceiling for cutout by using the housing as a template. Cutout dimensions: 10316" x 1412". The short side (10316") of the cutout must be right next to the ceiling joist.

4.Mark cutout along marked line.

NOTE: If ceiling is plaster, cutout should be made from below to avoid chipping plaster.

5.Install headers between joists using nails or screws leaving 10316" between them.

6.Install brackets upside down on housing's long dimension using hex nuts.

7.Mount damper section to housing, install housing and connect wiring and ductwork. Install power unit/blower assembly and grille.

 

MOUNTING

 

BRACKET

 

HOOK HANGER

 

RODS FROM INSIDE

 

TO OUTSIDE

 

HANGER ROD

HANGER

 

ROD

 

SLOT

POWER UNIT

 

FIGURE 7

SPRING

 

MOUNTING

 

CLIP

MOUNTING

 

SPRING

FIGURE 8

MOUNTING

BRACKET

HEADER

HEADER

FIGURE 9

Page 3
Image 3
NuTone QT150 Installation Existing Construction, Grille Installation, Maintenance, Wiring and Ducting Refer to for wiring