Installation
20 900-0113-01-00 Rev A
Mounting Surface
M8 x 1.25 Stud
Lock Washer
Battery
Cable Lug
13 mm Nut
Flat Washer
Insulator
Install battery cable lug, nuts and washers in the
order illustrated.
T
he battery cable lug should be the
first item installed on the stud. It should make solid
contact with the mounting surface. Do not install
hardware in a different order than shown.
Figure 9 Required Order of Battery Cable Hardware
CAUTION: Fire Hazard
Never install extra washers or hardware between the mounting surface and the
battery cable lug. The decreased surface area can build up heat.