| STACK GUARD |
| 1/2” |
| NUT |
| BASE |
| 1/2” WASHER |
FIGURE 4 | 1/2 X 4” BOLT |
STEP 4
•Remove two 1/2 X 4” BOLTS, two 1/2” WASHERS, and two 1/2” LOCK NUTS from the BASE and STACK GUARD as shown in FIGURE 4. (NOTE: Discard the 1/2 X 4” BOLT.)
|
| 1/2” |
| BASE | NUT |
|
| |
|
| 3 |
| 1 |
|
|
| STACK GUARD |
FIGURE 5 |
| 12 1/2 X |
|
|
STEP 5
•Securely fasten the FRONT LEG (1) and the BASE CONNECTION (3) to the BASE and STACK GUARD using two 1/2 X
| 1/2 |
| 1/2 |
| 1/2 |
| 1/2 |
| 1/2 |
|
| 1/2 |
| |||||||||||
0 |
|
| 1 |
|
| 2 |
|
| 3 |
|
| 4 |
|
| 5 |
| 6 | |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4