FIGURE 7

IMPORTANT: Cable must run

in all the pulley grooves.

2

13

STEP 7

Install the NEW PRIMARY CABLE (13) using the following steps:

Route the CABLE (13) through the TOP BOOM as shown in FIGURE 7. The pulleys in TOP BOOM may need to be temporarily removed to perform this step. (Note: Make sure the CABLE is running in all the pulley grooves.)

Route the CABLE (13) around the FLOATING PULLEY BRACKET as shown in FIGURE 7.

Route the CABLE (13) back over one pulley in the GUIDE ROD SUPPORT, down through the PULLEY BRACKET (2) and over the second pulley in the GUIDE ROD SUPPORT.

Screw the threaded end of CABLE (13) into the HEAD PLATE ASSEMBLY.

 

1/2

 

1/2

 

1/2

 

1/2

 

1/2

 

 

1/2

0

1

2

3

4

5

6

6

Page 6
Image 6
ParaBody 360101 manual Important Cable must run All the pulley grooves