FIGURE 9
IMPORTANT: Cable must run over the top of bolts.
2
16
STEP 9
Install the NEW
•Route the CABLE (16) through the TOP BOOM as shown in FIGURE 9. The pulleys in TOP BOOM may need to be temporarily removed to perform this step. (Note: Make sure the CABLE is running OVER the BOLTS connecting the FRONT UPRIGHT to the TOP BOOM. These may also have to be removed to perform this step.)
•Route the CABLE (16) around the PULLEY BLOCK as shown in FIGURE 9.
•Route the CABLE (16) back over one pulley in the TOP BOOM, down through the PULLEY BRACKET (2) and over the second
pulley in the TOP BOOM.
•Screw the threaded end of CABLE (16) into the HEAD PLATE ASSEMBLY.
STEP 10
• Loop CABLE (16) around one
7
3/8 13