15

4

5

FIGURE 3

STEP 3:

Insert one 3/4 X 4” SHAFT (15) thru pre-installed FLANGE BEARINGS in the SECOND ARM (5) as shown in FIGURE 3.

Insert one 3/4 X 4” SHAFT (15) thru pre-installed FLANGE BEARINGS in the MAIN ARM (4) as shown in FIGURE 3.

 

1/2

 

1/2

 

1/2

 

1/2

 

1/2

 

 

1/2

0

1

2

3

4

5

6

7

Page 7
Image 7
ParaBody LP5 manual Step