The MVL modem hardware installation is now complete. When the power cord is installed, the MVL modem goes through a power-on self-test.

Power-On

When power is applied, the MVL modem performs self-diagnostics and the PWR LED is on. The self-diagnostics includes a power-on self-test and all of the LEDs turn on for one second.

Power – green

Alarm – red

Test – yellow

Multiple Virtual Lines – green

Transmit/Receive – green

Ethernet Link – green

 

PWR ALM TST

LINE TX/RX

ETHERNET

 

 

MVL

 

 

 

 

TM MODEM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

99-15896-01

Refer to Troubleshooting on page 8 for LED indications requiring action.

7

Page 7
Image 7
Paradyne 6310 MVLt installation instructions Power-On, Alarm red