Patton electronic 2884 Planning the installation, Site log, Network information, Network Diagram

Models: 2884

1 51
Download 51 pages 18.45 Kb
Page 22
Image 22

OnSite Model 2884 User Manual

3 • OnSite installation

 

 

Planning the installation

Before installing the gateway router device, the following tasks should be completed:

Create a network diagram (see section “Network information” on page 22)

Gather IP related information (see section “IP related information” on page 23 for more information)

Install the hardware and software needed to configure the OnSite. (See section “Software tools” on page 23)

Verify power source reliability (see section “Power source” on page 23).

After you have finished preparing for gateway router installation, go to section “Installing the IpLink 2884” on page 23 to install the device.

Site log

Patton recommends that you maintain a site log to record all actions relevant to the system, if you do not already keep such a log. Site log entries should include information such as listed in table 5.

 

Table 5. Sample site log entries

 

 

Entry

Description

 

 

Installation

Make a copy of the installation checklist and insert it into the site log

 

 

Upgrades and maintenance

Use the site log to record ongoing maintenance and expansion history

 

 

Configuration changes

Record all changes and the reasons for them

 

 

Maintenance

Schedules, requirements, and procedures performed

 

 

Comments

Notes, and problems

 

 

Software

Changes and updates to software

 

 

Network information

Network connection considerations that you should take into account for planning are provided for several types of network interfaces are described in the following sections.

Network Diagram

Draw a network overview diagram that displays all neighboring IP nodes, connected elements and telephony components.

Planning the installation

22

Page 22
Image 22
Patton electronic 2884 user manual Planning the installation, Site log, Network information, Network Diagram