Manuals
/
PB Heat
/
Household Appliance
/
Boiler
PB Heat
MI/MIH series Electrical, 5 Zone Wiring with Zone Valves, 6 Zone Wiring with Circulators
Models:
MI/MIH series
1
22
43
43
Download
43 pages
13.15 Kb
19
20
21
22
23
24
25
26
<
>
Troubleshooting
Install
Repair Parts
Dimension
Maintenance
A. Wiring
Problem
1 Gas Valve, Manifold and Burner Assembly - Standing Pilot Continuous Ignition
Start-Upprocedures
C.Adjustment Of Gas Pressure Regulator
Page 22
Image 22
ELECTRICAL
Figure 6.5: Zone Wiring with Zone Valves
Figure 6.6: Zone Wiring with Circulators
20
Page 21
Page 23
Page 22
Image 22
Page 21
Page 23
Contents
Gas Boilers
Installation Operation & Maintenance Manual
Series MI/MIH
TABLE OF CONTENTS
TABLE OF CONTENTS
DANGER
USING THIS MANUAL
USING THIS MANUAL
A.INSTALLATION SEQUENCE
A.ACCESSIBILITY CLEARANCES
1. PREINSTALLATION
PREINSTALLATION
B.CLEARANCE FROM COMBUSTIBLE CONSTRUCTION
PREINSTALLATION
Figure 1.3 Air Openings - All Air Directly from
PREINSTALLATION
where
D.INSTALLATION SURVEY
PREINSTALLATION
E.PLANNING THE LAYOUT
2.BOILER SET-UP
BOILER SET-UP
WATER PIPING AND CONTROLS
3. WATER PIPING AND CONTROLS
A.BOILER SUPPLY AND RETURN
Installation with Air Elimination in
B. SAFETY RELIEF VALVE
Figure 3.3 Safety Relief Valve Hook-Up
Figure 3.4 Safety Relief Valve Hook-Upwith
Figure 3.5 Zone Piping with Zone Valves
WATER PIPING AND CONTROLS
C.PIPING FOR ZONED SYSTEMS
Figure 3.6 Zone Piping with Circulators
E.INDIRECT-FIREDWATER HEATER
WATER PIPING AND CONTROLS
D.EXPANSION TANK
F.FREEZE PROTECTION
B.VENT DAMPER INSTALLATION - GENERAL
4. VENTING
VENTING
A.INTEGRAL DRAFT HOOD
VENTING
C.VENT PIPING AND CHIMNEY
VENTING
D.BOILER REMOVAL FROM COMMON VENTING SYSTEM
5.GAS PIPING
GAS PIPING
Table 5.2: MI Boiler – LP Gas
GAS PIPING
Table 5.1 MI Boiler - Natural Gas
Table 5.3 MIH Boiler - Natural Gas
A. WIRING
6. ELECTRICAL
ELECTRICAL
B.ZONED SYSTEM WIRING
ELECTRICAL
D.SEQUENCE OF OPERATION
ELECTRICAL
2. Intermittent Ignition see Figure 6.3 above
ELECTRICAL
Figure 6.6 Zone Wiring with Circulators
Figure 6.5 Zone Wiring with Zone Valves
ELECTRICAL
START-UPPROCEDURES
7. START-UPPROCEDURES
A.COMPLETING THE INSTALLATION
START-UPPROCEDURES
Figure 7.1 Gas Valve, Manifold and Burner Assembly - Standing Pilot Continuous Ignition
START-UPPROCEDURES
Figure 7.4 Operating Instructions
LIGHTING INSTRUCTIONS
FOR YOUR SAFETY READ BEFORE LIGHTING
START-UPPROCEDURES
TO TURN OFF GAS TO APPLIANCE
D.ADJUSTMENT OF PILOT GAS FLOW
START-UPPROCEDURES
C.ADJUSTMENT OF GAS PRESSURE REGULATOR
B.CONTROL DESCRIPTIONS
F.CHECK-OUTPROCEDURE
START-UPPROCEDURES
E.CHECKING BURNER INPUT
START-UPPROCEDURES
b.Intermittent Ignition System
B.TROUBLESHOOTING GUIDES
8. TROUBLESHOOTING
TROUBLESHOOTING
DANGER
Table 8.1 Boiler Troubleshooting Guide
PROBLEM
TROUBLESHOOTING
POSSIBLE CAUSES
TROUBLESHOOTING
9. MAINTENANCE
MAINTENANCE
B.DAILY WITH BOILER IN USE
MAINTENANCE
A.GENERAL
C.WEEKLY WITH BOILER IN USE
DANGER
MAINTENANCE
The boiler is at room temperature
E.ANNUALLY BEFORE START OF HEATING SEASON
SERIES MI/MIH BOILER DIMENSIONS
10. BOILER DIMENSIONS & RATINGS
BOILER DIMENSIONS & RATINGS
SERIES MI/MIH BOILER RATINGS
REPAIR PARTS
11. REPAIR PARTS
REPAIR PARTS SERIES MI/MIH GAS BOILER
REPAIR PARTS
Figure 11.2 Manifold
Gas Valve and Pilot - Standing Pilot
REPAIR PARTS
Figure 11.3a
Figure 11.3b Gas Valve and Pilot - Intermittent
Table 11.4a Block/Draft Hood
REPAIR PARTS
Figure 11.4 Block/Draft Hood
Table 11.4b Flue Baffles for MIH Only
REPAIR PARTS
Figure 11.5 Jacket Table 11.5 Jacket
Figure 11.6 Controls/Circulator/Vent Damper
REPAIR PARTS
Table 11.6 Controls/Circulator/Vent Damper
Qualified Service Agency
Installation Operation & Maintenance Manual
TO THE INSTALLER
Series MI/MIH