C3472M-C (9/10) 11
Installation
The following installation should be performed by qualified service personnel or system installers.
NOTES:
Procure 4 mounting screws according to the material of the installation area. In this case, wood screws and
nails should not be used.
The recommended tightening torque is M4: 1.6 N·m (16 kgf·cm).
The required pullout capacity of a single screw/bolt is 196 N (20 kgf) or more.
If a ceiling board, such as plaster board, is too weak to support the total weight, the area shall be sufficiently
reinforced.
The protection sheet attached to the dome cover should be peeled off after installation.

DISASSEMBLING THE CAMERA

1. Peel off the protection sheet from the top cover (refer to Figure 3).
Do not remove completely as this protects the dome during installation.
Figure 3. Removing the Protection Sheet
2. Remove the top cover.
a. Unscrew the top cover fixing screw (refer to Figure4).
Figure 4. Removing the Top Cover Fixing Screw