![](/images/new-backgrounds/1010590/105905x1.webp)
2Window Preparation (continued):
B.
Note: The lower sash must be raised to drill the holes in the sill of the
Designer Series® |
|
|
and Pella® ProLine | Architect Series® |
|
| ||
1/2" | Drill 1/8" |
|
|
| |
| clearance hole |
|
Drill 1/8" |
|
|
clearance hole |
|
|
Clad Frame Head | ||
|
| |
|
| 1" |
|
| Drill 1/8" |
|
| clearance hole |
1/4" | Drill 1/8" |
|
clearance hole | Drill 1/8" | |
Drill 1/8" |
| |
clearance hole |
| clearance hole |
Drill 1/8" | Drill 1/8" | 1" |
clearance hole |
| |
clearance hole |
| |
|
| |
1/2" |
| Clad Frame Sill |
|
3Setting and Fastening the Window:
A.Slide the window into the opening, placing the bottom of the window on the spacers at the bottom of the opening.
3RVLWLRQWKHZLQGRZVRWKDWWKHH[WHULRUIDFHRIWKHIUDPHH[WHQGVDPLQLPXPRIRQWRWKHH[WHULRUZDOOPDWHULDOWR DOORZIRUWKHDSSOLFDWLRQRIEDFNHUURGDQGVHDODQW6HHLOOXVWUDWLRQVLQ6WHSIRUVHDODQWGHWDLOV&HQWHUWKHZLQGRZ EHWZHHQWKHVLGHVRIWKHRSHQLQJWRDOORZFOHDUDQFHIRUVKLPPLQJDQGLQVHUWRQH[ŵQLVKKHDGVFUHZLQWRHDFK of the top clearance holes. This will hold the window in place while shimming it plumb and square.
B.Place shims 1" from the bottom and top of the window between
the window and the sides of the opening and at the midpoint of the
ZLQGRZVLGH.HHSVKLPVEDFNIURPLQWHULRUIDFHRIZLQGRZ% Adjust the shims as required to plumb and square the window in the
opening. Also shim behind all the
Note: Do not shim above the window or in the space between the spacers at the bottom of the window. DO NOT over shim.