![YOU WILL NEED TO SUPPLY:](/images/new-backgrounds/174955/1749553x1.webp)
YOU WILL NEED TO SUPPLY:
•Composite or Impervious shims/spacers
(12 to 20)
•
•
•Wood blocking to support new window.
•Pella® SmartFlash™ foil backed butyl window
and door flashing tape or equivalent
•Pella Window and Door Installation Sealant or equivalent high quality,
(2 tubes per window) | SEALANT |
•Low expansion, low pressure polyurethane insulating window and door foam sealant -
DO NOT use high pressure or latex foams
Installation will require two or more persons.
TOOLS REQUIRED:
• Tape measure
• Level
•Sealant gun
•Square
• Screwdriver (Flat)
• Utility knife
• Hacksaw
• 5/32" and 3/8" drill bit
• 1/2" drill guide
• Drill
• Reciprocating saw
• Electric shears, circular saw or table saw (optional)
1 Opening Preparation
A.Prior to removing the existing window sash and/or glass, check that the frame size of the new window is 1/2” to 3/4” smaller that the inside of the existing frame or 1/2” to 3/4” smaller than the inside of the drywall return for the
1A |
B.Prepare the window opening by removing the sash and/or glass from the existing aluminum window frame.
Note: If a divider exists between vent and fixed glass areas it will be necessary to cut with a reciprocating saw or hacksaw and remove.
OPTIONAL FLUSH CUT METHOD
(Skip to step F for non flush cut installation)
C.Using a reciprocating saw cut two passes 2” apart through the exiting window stop flanges. Do not cut into the drywall.
1B |
1C |
2" |