3 Setting and Fastening The Window
A. Test fit the window in the opening from |
the exterior. Insert shims around the |
window temporarily while you verify that |
the window will fit into the opening and |
the window flanges will overlap the stucco |
or existing aluminum window frame by a |
minimum of 3/4" on all (4) sides. |
Note: Fix any problems with the opening |
before proceeding. If required, the |
exterior flush flange may be trimmed to |
fit inside exterior surround trim. Lay the |
window down on a flat surface. Use an |
electric shears, circular saw or table saw to |
cut the flange. |
3A
Window
Frame
3/4" Min.
B. Apply Pella SmartFlash tape across the |
head of the window extending 6" down |
each jamb. Place the tape starting on the |
aluminum cladding and extending onto |
the wood frame. |
6" | 6" | 6" |
Pella SmartFlash Tape
3B
6"
C.Place a 3/8" diameter (min.) line of sealant around outside edge of the existing window frame where the frame meets the stucco. It is important to leave a 2" gap in the sealant line at each of the weep holes of the existing aluminum window frame.
TWO OR MORE PERSONS WILL BE REQUIRED FOR THE FOLLOWING STEPS.
Exterior |
3C |
Weep holes |
DInsert the window from the exterior of the building and center the window in the prepared opening.
E.Place a shim aligned with the top
F.Continue placing shims at each
Note: DO NOT shim above the window. DO NOT over shim.
3E |
MAKE SURE THE FLANGE REMAINS PRESSED FIRMLY AGAINST THE WALL SURFACE