Page 2Pentair Water Commercial Pool and Spa

TABLE OF CONTENTS

SECTION 1.

 

SECTION 3.

 

General Information

 

Operation

 

1.1

Introduction

3

3.1

Controls - General

11

1.2

Heater Identification

3

3.2

Initial Start-Up

11

1.3

Primary/Secondary Pump and Piping

3

3.3

Safety Shutoff Component Checkout

12

1.4

Certifications

3

3.4

Inlet Temperature and

 

1.5

Engineering Assistance

3

 

Temperature Rise Adjustment

12

SECTION 2.

 

3.5

Heater Shut Down

13

 

3.6

Spring and Fall Operation

 

Installation

 

 

Stand-by Service

13

2.1

Boiler Placement

4

3.7

Winter Operation Complete Shutdown

14

3.8

Time Clock Operation

14

2.2

Installation of Indoor Boilers

4

3.9

Therapeutic Pools (Spas)

14

2.2.1

Combustion Air Supply

4

 

 

 

2.2.2

Venting

5

SECTION 4.

 

2.2.3

Common Venting System

 

 

 

Test Procedure

6

Maintenance

15

2.2.3Instructions Relatives au Test des

 

Systèmes à Évent Commun

6

SECTION 5.

 

2.3

Installation of Outdoor Boilers

7

Troubleshooting

16

2.4

Gas Supply and Piping

7

 

 

2.5

Electrical Wiring

8

SECTION 6.

 

2.6

General Piping Instructions

9

 

Parts Description and Order Numbers

17

2.7

Boiler By-Pass Piping

9

 

 

2.8Temperature Sensor Placement

 

and Installation

10

2.9

Automatic Chlorinators

10

Pentair Technical Support

Sanford, North Carolina (8 A.M. to 5 P.M.)

Phone: (800) 831-7133

Fax: (919) 566-8920

Moorpark, California (8 A.M. to 5 P.M.)

Phone: (800) 831-7133

Fax: (800) 284-4151

Web sites: visit www.pentairpool.com and www.staritepool.com

Page 2
Image 2
Pentair MT Sizes 500 important safety instructions Table of Contents