STACKING KIT INSTALLATION
Step 3: Attach mounting plate (where the leg levelers were removed in step 2) by using
Bottom of |
cabinet |
Flange |
Step 4: Place upper unit on top of lower unit and attach using #10 sheet metal screws (where the rivets were drilled out in step 1).
7
68 8 "
NOTE: EXTENSION OF LEG LEVELERS
WILL INCREASE ASSEMBLY HEIGHT
8300 W. Good Hope Rd. Milwaukee, WI 53223 Phone:
Perlick is comitted to continuous improvement. Therefore, we reserve the right to change specifications without warning
95010 REV C