
Installation
Tower InstallationNOTE If you are installing the UPS and the EBM for the first time, follow the installation instructions in the UPS user’s guide.
NOTE The air vents should be at the top of the unit when positioned vertically.
Air Vents
Figure 4. Tower UPS with EBMs
1.Remove the adjacent corner screws from the rear panels as shown in Figure 5 to install the EBM brackets. Discard the screws.
2.Align each EBM bracket with the screw holes and secure with the screws provided in the accessory kit.
3.If installing additional EBMs, repeat Steps 1 and 2 for each cabinet.
12 | Powerware® 5125 |