Precisionaire 319 manual Recommended Change-OutProcedures, Neshap, and 3 Stage Compliant System

Models: 319

1 5
Download 5 pages 21.61 Kb
Page 2
Image 2
2-Stage System Options

NESHAP 319

2 and 3 Stage Compliant System

2-Stage System Options

All products listed are located within this catalog.

Flanders Precisionaire Products

Stage 1

FP3

332

331Y

330G

PA100

Options

PA 200

PA 300

PA 400

PA500

PA600

 

PS 125

225T Panel

325T Panel

425 Panel

ST55 Panel

 

 

 

Stage 2

Cube 2325T Cube Filter (2-Pocket 325T Series Cube)

 

Mandatory

 

 

 

 

 

3-Stage System Options

All products listed are located within this catalog.

Flanders Precisionaire Products

Stage 1

FP3

332

331Y

330G

PA100

Media Pad

PA 200

PA 300

PA 400

PA500

PA600

Options

PS 125

 

 

 

 

 

 

 

 

 

 

Stage 2

225T Panel

325T Panel

425T Panel

ST55 Panel

 

Options

225T Cubes

325T Cubes

425T Cubes

Any Stage 1 Option

 

 

 

 

 

 

Stage 3

 

319A 95% Bags

 

 

 

Mandatory

 

 

 

 

 

Recommended Change-Out Procedures

1.When the entire system is installed, obtain a static pressure reading for the clean system

2.Change out the first stage when the static pressure rises a1.0 w.g. above the initial resistance.

3.Repeat this procedure until the static pressure remains at 1.0 w.g. even with a clean first stage installed. At that time, replace the first and second stage. If a three-stage system is used, continue replacing stage 1 and 2 until the third stage maintains a 1.0 w.g. reading with both clean first and sec- ond stages installed, then replace the entire system.

Initial pressure for a system can be estimated for an airflow velocity of 150 FPM by totalling the initial pressure drop for each stage. This data is available in the technical performance data in this catalog.

Item No.

Item

Model

Description

Qty/Cs

DP

PA1438

FP319A395S2415

12x24x15 PAK FP319A 95% 3Stage

4

DP

PA1439

FP319A695S0015

20x20x15 PAK FP319A 95% 3Stage

4

DP

PA1440

FP319A695S4415

24x24x15 PAK FP319A 95% 3Stage

4

69

Page 2
Image 2
Precisionaire 319 manual Recommended Change-OutProcedures, Neshap, and 3 Stage Compliant System, StageSystem Options