Premier Mounts PP-5AINSTALLATION INSTRUCTIONS, Installation Instructions, Page

Models: PP-5

1 2
Download 2 pages 16.15 Kb
Page 2
Image 2
PP-5A INSTALLATION INSTRUCTIONS

PP-5A INSTALLATION INSTRUCTIONS

The ceiling should be capable of supporting at least five (5) times the weight of the product that will be used with this accessory. If the surface cannot support this weight, it must be reinforced. Proper installation procedure by qualified personnel as outlined in the installation instructions must be adhered to. Failure to do so could result in serious personal injury.

Step 1. Install the PP-5A to the ceiling structure according to commercial standards (Figure 2). Step 2. Use (commercially available) suitable hardware depending on the installation requirements. Step 3. See Figure 2 for cable access and 360º rotation.

Step 4. Install the desired length of 1-1/2” diameter NPT pipe with the threaded ends attaching to the PP-5A. Step 5. Tighten the M6 x 12mm screws to secure the pipe.

For adjustable suspension applications, the PP-5A can be mated directly to our APP-2446 suspension adapter.

Commercially Available Hardware

Figure 2

PP-5A

Bolt

Washer

Ceiling

Washer

Nut

Cable Access

1-1/2” Coupler

Locking Screw - M6 x 12mm

Phillips Head Screw

Installation Instructions

Page 2

Page 2
Image 2
Premier Mounts installation instructions PP-5AINSTALLATION INSTRUCTIONS, Installation Instructions, Page