Proline PLFW812 Preparation, Inspect Range Hood, Tools You’Ll Need, Prepare Ductwork, Test

Models: PLFI520 PLFW750 PLFL832 PLFW520 PLFI544 PLFW832 PLFW543 PLFI543 PLFW544 PLFW812 PLFI750

1 26
Download 26 pages 40.32 Kb
Page 12
Image 12
PREPARATION

8PROLINE RANGE HOODS

PREPARATION

INSPECT RANGE HOOD

1. Check contents of box:

chimney

ceiling bracket range hood flexible duct

small bag of hardware

2. Test

plug in and test controls, lights, fan

inspect for any damage during shipping

you must report any damage to Proline within 7 days for a refund

TOOLS YOU’LL NEED

power drill screwdrivers drill bit

tape measurer marking pencils

duct tape aluminum backed level

wall anchors (Make to buy the right kind. Hardware stores can help)

PREPARE DUCTWORK

Ductwork should already be punched through celling (or the wall if ceiling is not an option) and ready to hook up to the range hood before beginning installa- tion. See venting requirements on page 7 of this user manual.

If you are not venting to the outside of your home, be sure to install your charcoal filters before mounting the hood to the wall. See information on char- coal filters on page 5 of this manual.

Page 12
Image 12
Proline PLFW812, PLFI750 Preparation, Inspect Range Hood, Tools You’Ll Need, Prepare Ductwork, Check contents of box, Test