Prozone Pool Products CSS10 owner manual Diagram 7 Ozone System Connection, ·metal clamp View D

Models: CSS10

1 13
Download 13 pages 2.08 Kb
Page 9
Image 9
·metal clamp (View D)

 

PVC Pipe

 

 

Screw (2)

Diagram 5

Washer (2)

 

Upper Saddle Clamp

Rubber Bushing

1 1/2" Adapter – Upper

 

 

Neoprene Gasket

1.5” Saddle Clamp Assembly

(Diagram 7) Ozone System ConnectionSecure with black hose clamp 7/8" Dia. Hole

Manual backgroundManual backgroundManual backgroundManual backgroundManual background Neoprene Gasket

1 1/2" Adapter – Lower

·Assemble 2nd Saddle Clamp (View C)(Diagram 5)

Manual background Gasket Foot (2)

Manual background Lower Saddle Clamp

Manual background Nut (2)

2” Saddle Clamp Assembly

·Insert 3 inch white PVC pipe into top of Saddle Clamp,

·push pipe through Saddle clamp into hole in return line

·Place two metal clamps on remaining ¾” hose line Attach one end of hose to top of Salt Cell, tighten with

·metal clamp (View D)

Attach other end of ¾” hose to 3 inch PVC pipe, tighten with metal clamp (View D)(Diagram 6)

Diagram 6

CSS

Complete Sanitation System

Automated System Control

OZONE SALT/CHLORINATOR SYSTEM

Filter Return Flow to Pool Heater

Return Flow to Pool

(Diagram 7) Ozone System Connection

·

Cut 6 inch piece of ¼” braded hose

 

 

 

 

 

 

Diagram 7

 

 

 

 

 

 

 

 

 

Attach longer ¼” braded hose to ozone fitting on top of CSS10 Power Box

 

·

Secure with black hose clamp

 

 

 

 

 

 

 

 

·

Insert check valve in other end of longer braided hose,

 

 

· make sure the air flow is correct (View B)

 

 

 

 

 

 

 

·

Attach 6 inch piece of ¼” braided hose to check valve

 

 

Secure with black hose clamp

 

 

 

 

 

 

1/4" Polybraid Hose

 

· Attach end of ¼” braided hose to

 

 

 

 

 

 

from Ozonator to Check Valve

 

 

 

 

 

 

 

1/4" Check Valve

 

· open port on top of injector (Diagram 8)

 

 

 

 

 

 

 

 

 

 

 

 

 

(See "B")

 

 

 

 

 

 

 

 

 

1/4" Polybraid Hose

 

 

 

 

 

 

 

 

 

from Check Valve to Injector

..................

 

 

Flow

 

 

 

 

 

Saddle Clamp

 

 

 

 

 

 

lo

 

Flow

 

 

 

 

e

 

w

&

 

 

 

 

n

F

 

Injector Assembly

Water

 

Diagram 8

 

o

 

 

 

 

 

 

O

 

 

 

 

 

 

 

 

z

 

 

 

 

 

 

 

 

Water

 

 

 

 

 

Pool Return Line after Pump

 

 

 

Open Port

 

 

 

Injector

 

 

 

 

 

 

 

 

 

 

 

 

CSS

Complete Sanitation System

Automated System Control

OZONE SALT/CHLORINATOR SYSTEM

 

...............FlowAir

3/4" Clear Vinyl

 

Bypass Hose

 

20264 PN

View "B"

 

9

Page 9
Image 9
Prozone Pool Products CSS10 Diagram 7 Ozone System Connection, ·metal clamp View D, Secure with black hose clamp