QHT B3-B9 installation instructions Boiler Location

Models: B3-B9

1 36
Download 36 pages 5.67 Kb
Page 9
Image 9

3. Boiler Location

The following are the minimum clearance to construction or combustible materials:

1.9” from the top, sides, and rear of the boiler.

2.18” from the flue pipe in any direction.

3.24” from the front of the boiler.

9”

24”

9”

DANGER

The boiler must be located on a non-combustible floor. A smooth, level concrete floor is recommended. Locate the boiler as close as possible to the chimney. If boiler is installed on combustible flooring, consult local authorities for proper method of covering floor. The boiler must not be installed on carpeting.

Caution: Do not store or use flammable materials, chemicals or flammable liquids, especially gasoline, in the vicinity of this heating appliance.

If the boiler is to be installed in a "direct vent" configuration, please refer to the B10 Direct Vent Addendum supplied with the Direct Vent Kit.

PROVISIONS FOR COMBUSTION AIR AND VENTILATION AIR MUST BE IN ACCORDANCE WITH SECTION 5.3, “AIR FOR COMBUSTION AND VENTILATION”, OF THE NATIONAL FUEL GAS CODE, ANSI Z223.1, OR APPLICABLE PROVISIONS OF THE LOCAL BUILDING CODES. DO NOT

INSTALL THE BOILER UNTIL PROPER COMBUSTION AIR HAS BEEN ARRANGED.

WARNING

Boiler is certified as an indoor appliance. Do not install boiler outdoors or locate where it will be exposed to freezing temperatures

Page 9

Page 9
Image 9
QHT B3-B9 installation instructions Boiler Location