FC420 Fibre Channel Bridge Quick Reference Guide
This Quick Reference Guide explains how to install one FC420 Fibre Channel bridge in an ATL M1500 library, or up to three FC420 bridges in an ATL M2500 library.
If you are unfamiliar with any of the information or procedures in this document, the Quantum Help Desk is ready to assist you 24 hours a day, 7 days a week. To reach the Help Desk, call the number for your area listed in the Quantum ATL
This document and others related to the ATL
(PN 6423013).
Note: Adobe Acrobat Reader is required to view and print PDF documents. To download a free copy of Adobe Acrobat Reader, go to www.adobe.com.
Step 1: Prepare for Installation
1Make sure your system meets the following requirements:
•
•For fabric configurations, a
•
•Windows® NT 4.0 SP6 or later, Windows 2000 SP2 or later, Solaris® 8 and 9, or other
Note: For a complete list of
Note: The FC420 Fibre Channel bridge can only be used in LVD- configured libraries.
Make sure you have the tools recommended for this procedure:
•#1 PHILLIPS® screwdriver
•Flat blade screwdriver
2Verify the contents of the FC420 Bridge Upgrade Kit, referring to the Quantum FC420 Upgrade Kit Contents List (PN 6473023).
Caution: The small
3Take precautions to prevent electrostatic discharge (ESD). These precautions include:
•Wearing a properly grounded antistatic wrist strap
•Wearing other antistatic apparel (smock, footwear, etc.)
•Handling library components with care and keeping the FC420 bridge in its antistatic packaging until you are ready to install it
Caution: Failure to take adequate antistatic precautions may result in damage to the FC420 bridge or other library components.