INSTALL SUPPORT SYSTEM
1.At hood location, install 2 x 4 cross framing between ceiling joists using dimensions shown.
2.Finish the ceiling surface. Be sure to mark the location of the ceiling joists and cross framing.
3.Position the support frame so that the support frame opening is on the long side of the hood.
4.Secure the support frame to joists and cross framing with four screws provided. Make sure screws are driven into center of joists and framing for maximum strength.
5.Adjust the overall height of the support frame. Loosen and
TYPICAL SUPPORT FRAME MOUNTING
CONNECT DECORATIVE FLUE
1.Secure the upper flue to the upper support frame with the mounting screws.
2.Insert the lower flue moving it completely towards the top and fix it temporarily with retaining screws.
INSERT THE LOWER
FLUE AND FIX IT
TEMPORARILY
CROSS FRAMING | 713/16” |
CEILING
JOISTS
HEIGHT
ADJUSTMENT
SLOTS
SUPPORT
FRAMESUPPORT
OPENINGFRAME
TOP VIEW OF
SUPPORT FRAME
107/8”
713/16”
MOUNTING SCREWS
UPPER FLUE
LOWER
FLUE