Raypak 2100-4001 warranty Hydronic Heating Boilers, Commercial, Engineer, Contractor, Prepared By

Models: 2100-4001

1 2
Download 2 pages 29.41 Kb
Page 1
Image 1
Raytherm® - Type H

Job:

 

 

 

 

Raytherm® - Type H

Engineer:

 

 

 

 

 

 

Hydronic Heating Boilers

 

 

 

 

 

 

Contractor:

 

 

 

 

 

Commercial

 

 

 

 

 

Prepared By:

 

 

 

 

Models 2100-4001 (Indoor)

Model:

 

Date:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EFFICIENT

 

 

 

 

 

 

 

 

 

 

82% thermal efficiency – highest of any atmospheric

 

 

boiler available today

 

 

 

 

 

THERMAL SHOCK PROOF

 

 

 

 

 

Twenty-year warranty against thermal shock damage

 

 

up to 150°F differential

 

 

 

 

 

Maximum operating temperature: 230°F

 

 

LIGHTWEIGHT

 

 

 

 

 

A floor load of 70 lbs./sq. ft. or less

 

 

 

 

 

HIGH RECOVERY

 

 

 

 

 

Cuts fuel costs substantially because the standby and

 

 

radiation losses normal to other boilers and tank-type

 

 

water heaters are eliminated

 

 

 

 

 

LOW WATER OPERATING TEMPERATURE

Fig. 8184

 

Operates with water temperature as low as 105°F

 

 

without condensing

 

 

 

 

 

 

 

 

 

 

Heat Exchanger

ƒASME Inspected and Stamped 160 PSIG

ƒNational Board Approved

ƒHeaders

Engineer: Glass-lined Cast Iron – Standard

Hydronic Heating Boilers Bronze – Option A-1

ƒFinned Tubing

Contractor: Copper – Standard

Commercial Cupro Nickel – Option A-3

ƒASME Steel Tube Sheet

ƒSilicone O-Rings

ƒ60 PSIG ASME Pressure Relief Valve

ƒTemperature and Pressure Gauge (Boiler)

ƒWater Connections

Prepared By: Left Hand – Standard

Models 2100-4001 (Indoor) Right Hand – Option A-6

ƒFlow Configuration

Model: Two-pass (Standard)

Date: Single-pass (Cast Iron Only)

Controls

ƒ120V, 60Hz, 1 Ph Power Supply

ƒ120/24V Transformer

ƒ100% Pilot Shut-off/Lockout

ƒElectronic, Intermittent Ignition (IID) Pilot

ƒHigh Limit Control, Manual Reset

ƒHigh Limit Control, Auto Reset – Models 3001-4001

ƒOn/Off Switch

ƒFlow Switch

ƒEconomaster II Pump Time Delay

Gas Control Train

ƒManual Main Gas Shut-off Cock

ƒMain Gas Pressure Regulator

ƒRedundant Safety Shut-off Valve

ƒControl Valve

ƒFiring Mode

Manual background On/off (H4)

Manual background Two-stage Firing (H3)

Manual background Four-stage Firing (H9)

Manual background Motorized Modulation (H2)

Manual background B-6000 (H6)

ƒFuel

Manual background Natural Gas

Manual background Propane Gas

ƒDesign Certified ANSI Z21.13/ CSA 4.9

Construction

ƒFront Controls

ƒStainless Steel Burners

ƒPolytuf Powder Coat Finish

ƒBuilt-in Draft Diverter

ƒDraft Inducer

Manual background Motorized Draft Inducer – Option D-2

Temperature Controllers

B-7

Modulating

B-5

Modulating, Outdoor Reset

B-6

Two-stage

B-

 

Four-stage Digital

Y-241

Electronic Sequencer,

 

 

1-4 Stages

Y-281

Electronic Sequencer,

 

 

1-8 Stages

Additional Safety Controls

Manual backgroundManual background F-9 Low Water Cut-off Probe

Manual backgroundManual background I-1 High Limit Control,

Auto Reset

Manual backgroundManual background S-1 Low Gas Pressure Switch

Manual backgroundManual background S-2 High Gas Pressure Switch

Regulatory Agency Requirements

Catalog No.: 2000.26M

Effective: 12-1-07

Replaces: 12-1-99

Page 1
Image 1
Raypak 2100-4001 warranty Hydronic Heating Boilers, Commercial, Engineer, Contractor, Prepared By, Model, Date