3.2START-UP

A.Shall be performed by Raypak factory-trained personnel.

B.Test during operation and adjust if necessary:

1.Safeties (2.2 - F)

2.Operating Controls (2.3)

3.Static and full load gas supply pressure

4.Gas manifold and blower air pressure

C.Submit copy of start-up report to Architect and Engineer.

3.3TRAINING

A.Provide factory-authorized service representative to train maintenance personnel on procedures and schedules related to start-up, shut-down, trouble shooting, servicing, and preventive maintenance.

B.Schedule training at least seven days in advance.

END OF SECTION