UNIT ASSEMBLY

HOW TO FOLD THE CUFF

The cuff should already be folded through the metal D-ring when you remove the cuff from the box. If the cuff is not prefolded, lay the cuff flat in front of you. Place the metal D-ring on your left.

The stethoscope faces up. Pull the end of the cuff through the metal D-ring. When the cuff is folded correctly, the hook and pile material faces the outside of the cuff loop.

HOW TO ASSEMBLE THE MONITOR

Lay the parts out as illustrated on the next page. Refer to the illustration to help you put the unit together.

Follow these four easy steps:

1.) Attach the gauge to tubing on the left.

2.) Attach the inflation bulb to the tubing on the right.

3.) Attach the single end of the Y-tubing to the stethoscope chestpiece.

4.) Attach the double end of the Y-tubing to the binaural.

4

Page 4
Image 4
ReliOn HEM-18SREL instruction manual Unit Assembly, HOW to Fold the Cuff, HOW to Assemble the Monitor