1 • UNDERSTANDING YOUR IRONING CENTRE

14

15

1

3

5

7

6

4

12

11

13

9

8

10

2

12

6

7

13

1.Iron

2.Electric power cord (iron + board)

3.Steam cord

4.Steam cord support

5.Iron rest-plate

6.Removable water tank

7.Iron, power cord and steam cord storage space

8.Control panel

9.Steam generator screw-clamps

10.Wheels (rubber-coated to protect delicate floors)

11.Feet

12.Semi-automatic opening lever (use only to open the board)

13.Board closing and height adjuster lever (use this lever to close the board)

14.Heated, active ironing area with ironing board cover

15.Suction-blower unit

Page 2
Image 2
Rowenta 032621 - IC7100 - 50/03 manual Understanding Your Ironing Centre