7 | Repeat Steps | |
Continue to Step 7. |
| |
E | G | 1 |
Q |
1 | 2 |
|
E | 2 | G |
| ||
|
|
9 | Install Gable (M) onto top of front wall engaging the 2 dovetails on |
the front panel and the dovetail on the side panel on both the left | |
and right sides of the shed. | |
DO NOT ENGAGE THE SNAPS. |
M
8 | Install Gable (M) onto top of back wall engaging the 2 dovetails and snaps |
on the back panel and the dovetail on the side panel on both the left and | |
right sides of the shed. |
M
10 | Install Left Door Panel (K) inserting the lower hinge pin into Left |
| |
| Floor (A) socket, lift the left end of the Gable (M) enough to insert |
| the top hinge pin on |
| Left Door Panel (K) into the Gable (M) socket. |
|
|
4
M
3
2
K |
1