Ruud AP13370-2 Venting System Inspection, Burner Inspection, Vacation and Extended Shut-Down

Models: AP13370-2

1 28
Download 28 pages 44.43 Kb
Page 24
Image 24

Care and cleaning of the water heater.

Venting System Inspection

It is recommended that the water heater’s internal flue be inspected annually to be certain it is clean by removing the Blower Assembly.

When reinstalling the flue baffle make certain it is hung securely by its hanger at the top of the flue way.

Reinstall the Blower Assembly as per instructions on page 10. Make sure that the Blower Assembly is tightly screwed to the top pan of the water heater.

Inspect the gas vent pipes and the termination elbow.

Make certain the vent pipes are properly sealed and securely attached.

If after inspection of the vent system you found soot or deterioration; call the local gas utility to correct the problem and clean the flue, or replace the flue, flue baffle, and venting system before resuming operation of the water heater.

Test for spillage at the Blower Assembly after 5 minutes of burner operation. Use a flame of a match or candle or smoke.

Sheet Metal Burner

Cast Iron Burner

Proper burner and pilot burner pattern.

Burner Inspection

Visually inspect the pilot burner and main burners annually.

With the jacket and inner doors removed, inspect the pilot burner flame and the main burner while firing.

If any unusual burner operation is noted, the water heater should be shut off until qualified service assistance can be obtained.

!CAUTION: For your safety, cleaning of the burner must be performed only by qualified service personnel.

For cleaning, after shutting off the gas and electrical supplies to the water heater, remove the burner from the water heater. A vacuum cleaner can be used on the burner and floor shield inside the water heater.The burner can also be cleaned by scrubbing with mild detergent.

Vacation and Extended Shut-Down

NOTICE: Refer to the Hydrogen Gas Caution in the Operating Instructions.

If the water heater is to remain idle for an extended period of time, the power and water to the appliance should be turned off to conserve energy and prevent a build-up of dangerous hydrogen gas.

The water heater and piping should be drained if they might be subjected to freezing temperatures.

After a long shut-down period, the water heater’s operation and controls should be checked by qualified service personnel.

Make certain the water heater is completely filled again before placing it in operation.

NOTICE: Do not remove the anode rod from the water heater’s tank, except for inspection and/or replacement, as operation with the anode rod removed will greatly shorten the life of the glass lined tank and will exclude warranty coverage.

Anode Rod

This water heater is equipped with an anode rod designed to prolong the life of the glass lined tank. The anode rod is slowly consumed, thereby eliminating or minimizing corrosion of the glass lined tank.

Water sometimes contains a high sulfate and/or mineral content and together with cathodic protection process can produce a hydrogen sulfide, or rotten egg odor in the heated water. Chlorination of the water supply should minimize the problem.

24

Page 24
Image 24
Ruud AP13370-2 Venting System Inspection, Burner Inspection, Vacation and Extended Shut-Down, Anode Rod

AP13370-2 specifications

The Ruud AP13370-2 is a high-performance air conditioning unit designed for both residential and commercial spaces, delivering efficient cooling and heating solutions. This model stands out for its advanced technology and user-friendly features, making it a favored choice among consumers seeking comfort and reliability.

One of the main features of the Ruud AP13370-2 is its Energy Efficiency Ratio (EER), which ensures lower energy consumption while providing optimal cooling performance. With its high SEER (Seasonal Energy Efficiency Ratio) rating, the unit is designed to operate with minimal energy usage, thus reducing electricity bills and environmental impact. This efficiency is crucial for eco-conscious homeowners and business operators.

The AP13370-2 integrates innovative inverter technology, allowing for variable speed operation. This technology adjusts the compressor speed to match the desired temperature, providing more precise climate control and reducing noise levels. Consequently, users can enjoy a quieter indoor environment without sacrificing comfort.

In addition to its energy-saving capabilities, the Ruud AP13370-2 is equipped with advanced filtration systems. These filters capture dust, allergens, and other pollutants, enhancing indoor air quality. This is particularly beneficial for individuals with allergies or respiratory issues. The filtration system is designed for easy maintenance, allowing users to replace or clean filters effortlessly.

Moreover, the unit supports smart home integration, enabling remote control through mobile devices or smart speakers. Users can adjust the settings, schedule operations, and monitor energy usage conveniently, fostering a seamless user experience. This feature is especially valuable for those with busy lifestyles, allowing for efficient climate management even when away from home.

Durability is another important characteristic of the Ruud AP13370-2. Constructed with high-quality materials, it is built to withstand varying weather conditions, ensuring longevity and reliability over time. The unit also features a comprehensive warranty, providing users with peace of mind.

Overall, the Ruud AP13370-2 air conditioning unit combines efficiency, technology, and user-friendly features. Its commitment to energy savings, air quality improvement, and smart technology integration makes it an excellent choice for anyone looking to enhance their indoor climate while minimizing their environmental footprint. Whether for home or business use, the AP13370-2 stands as a testament to modern HVAC design and engineering.