PFD1/PFS1 – OPERATING INSTRUCTIONS

 

 

INDEX

 

Page

 

 

I – General

 

2

 

 

I.1 – Introduction

 

 

 

 

I.2 – Materials

 

 

 

 

I.3 – Operation description

 

 

 

 

I.4 – Pump Data

 

 

 

 

II – Quick checklist

 

2

 

 

II.1 – Shipment

 

 

 

 

II.2 – Reception

 

 

 

 

III – Installation and operation

 

3

 

 

III.1 – Testing

 

 

 

 

III.2 – Set up

 

 

 

 

III.3 – Connections

 

 

 

 

III.3.1 – Air/nitrogen connections

 

 

 

 

III.3.2 – Fluid connections

 

 

 

 

III.4 – Initial tests and Adjustments

 

 

 

 

IV – Applications

 

4

 

 

IV.1 – Chemical compatibility

 

 

 

 

IV.2 – Contamination

 

 

 

 

IV.3 – Temperature range

 

 

 

 

IV.4 – Applications

 

 

 

 

IV.5 – Limitations of use

 

 

 

 

V – Maintenance

 

5

 

 

V.1 – Trouble shooting

 

 

 

 

V.2 – Preventive maintenance

 

 

 

 

V.2.1 – Continuous operation

 

 

 

 

V.2.2 – Intermittent operation

 

 

 

 

V.3 – Comments

 

 

 

 

VI – Dismantling and Repair

 

6

 

 

VI.1 – How to dismantle

 

 

 

 

VI.2 – Examination

 

 

 

 

VI.3 – Stripping and assembling the pump

 

 

 

VI.3.1 – Replacing the shuttle valve

 

 

 

VI.3.2 – Replacing the bellows

 

 

 

 

VI.3.3 – Replacing the central shaft and shaft composite rings

 

 

 

VI.3.4 – Replacing the PTFE sleeves

 

 

 

VI.3.5 – Replacing the bellow and body O.rings

 

 

 

VI.3.6 – Replacing the manifold O.rings

 

 

 

VI.3.7 – Replacing other parts

 

 

 

 

VII – Warranty

 

11

 

 

Appendix: Spare parts list

 

 

 

 

Maintenance kits

 

 

 

 

Section view (drawing “APP 1 REF”)

 

 

 

Part numbers table (“APP 1 REF”)

 

 

 

 

General arrangement drawing (drawing “APP 1 EXT”)

 

 

 

Flow rate/discharge pressure curves

 

 

 

Pneumatic diagram (drawing “APP 1 CAB”)

 

 

 

 

 

 

 

 

INDEX

DATE

 

 

03

27/09/01

DC01020US

 

Page 2
Image 2
Saint Gobain Vidros PFD1, PFS1 manual Index