PFD1/PFS1 – OPERATING INSTRUCTIONS

II.2 – Reception

Upon receipt of the pump, please check that:

The carton has not been damaged in transit. If there is any visible damage, immediately contact the carrier.

The pump is not damaged. If there are signs of damage, you should report this immediately to SGPPL ASTI or your local distributor.

An operating instruction manual has been included in each package. Please request another copy if it has not been included.

III – Installation and Operation

III.1 – Testing

All pumps are tested with DI water at the factory in our clean room for:

Maximum flow rate with no back pressure

Minimum flow rate with no back pressure

Flow rate with 58 PSI (4 bar) discharge pressure

Checked for leakage

III.2 – Set up

The pump must be installed horizontally as shown on general arrangement drawing (see appendix “APP 1 EXT”). This drawing also shows the overall dimensions of the pump etc.

The pump must be positioned on its feet. If not, the check valves will not seat correctly and the pump may malfunction.

III.3 – Connections

III.3.1 – Air/Nitrogen connection

The pump must be connected to a clean dry air or nitrogen supply. On no account should the air/nitrogen supply be lubricated, oil or water droplets will cause the shuttle valve to malfunction.

Minimum and maximum supply pressure must be between 29 and 72.5 PSI (2 and 5 bar). For optimum pump operation, we recommend a supply pressure of 51 PSI (3.5 bar).

The ID of the tube supplying the dry air/nitrogen should not exceed 3/32” (2.5 mm). The tube length between the pump and on/off valve should be between 10 feet minimum (3 m) and 20 feet maximum (6 m).

When in aggressive conditions (acid vapors), it is advised to canalize outlet with a tube of minimum ID 1/4” (6 mm).

The pneumatic on/off valve must be 3-way to ensure the shuttle valve on the pump resets itself when the pump is switched off. The flow control valve must be positioned before the 3-way on/off valve (see appendix “APP 1 CAB”).

A remote control box with on/off switch and needle valve (P/N 21 000 04) is available as an optional extra.

3/11

INDEX

DATE

03

27/09/01

DC01020US

Page 4
Image 4
Saint Gobain Vidros PFD1, PFS1 manual III Installation and Operation, II.2 Reception, III.1 Testing, III.2 Set up