![](/images/new-backgrounds/1211515/21151521x1.webp)
connections
instaLLing the toroidaL ferrite on the PoWer caBLe
Lift up to release the lock and open the core.
Close the lock back. | Wind Power cable around the core three times. |
| (Start winding at |
ENG
●CONNECTIONS
11
Lift up to release the lock and open the core.
Close the lock back. | Wind Power cable around the core three times. |
| (Start winding at |
ENG
●CONNECTIONS
11