![](/images/new-backgrounds/1273329/27332921x1.webp)
connections
instaLLing tHe tOrOiDaL ferrite On tHe POWer caBLe
Lift up to release the lock and open the core.
Close the lock back. | Wind Power cable around the core three times. |
| (Start winding at |
instaLLing tHe ferrite cOre On tHe Lan caBLe
Lift up to release the lock and open the core.
Close the lock back. | Place the LAN cable on the opened core. |
EnG
●connEctions
11