AC24V/DC12V
1Power Port
Port that is connected to the power (adaptor) cable.
-For
If properly supplied with power, the LED turns on.
3Vertical Synchronization Phasing Switch (Left) Used to adjust the vertical synchronization phasing. If pressed, the vertical synchronization moves to the left.
4Vertical Synchronization Phasing Switch (Right)
Used to adjust the vertical synchronization phasing. If pressed, the vertical synchronization moves to the right.
ENG
08