AC24V/DC12V (SCC-B1311, B1311P)

AC220V ~ 240V (SCC-B1011P)

6

1Power Port

Port that is connected to the power (adaptor) cable.

-For SCC-B1311, B1311P Connects to AC 24V or DC 12V.

-For SCC-B1011P

Connects to AC220V ~ 240V.

2Power Indication LED

If properly supplied with power, the LED turns on.

3Vertical Synchronization Phasing Switch (Left) Used to adjust the vertical synchronization phasing. If pressed, the vertical synchronization moves to the left.

4 Vertical Synchronization Phasing Switch

5

1. ELC

2. BLC

3. FL

4. AWB

L/L

AC 220-240V

(Right)

1 Used to adjust the vertical synchronization phasing. If pressed, the vertical synchronization moves to the

3

INT EXT

4 7

right.

2

8

GND

VIDEO OUT

08

3D-B1311-EU.indb 8

2008-04-30 오후

Page 14
Image 14
Samsung SCC-B1311(P) operating instructions Power Port, For SCC-B1011P, Power Indication LED