INSTALLING THE REFRIGERATOR/FREEZER

Allow an adequate space and install the refrigerator/freezer on a firm, level floor.

If the appliance is not level, there may be unusual noises and poor cooling.

Wait for at least one hour before plugging the appliance in.

Clean the refrigerator/freezer.

• Wipe and clean the appliance inside and outside with a damp cloth.

Plug the refrigerator/freezer into a wall socket used exclusively by this appliance.

• This appliance must be properly earthed.

Place the food in the refrigerator/freezer.

• It is recommended that you wait for the appliance to cool for 2-3 hours before storing food in it.

Warning

Use of an earthed socket exclusively for the appliance:

• If you are using a socket with an earthing terminal, you do not require a separate earthing connection.

Use of a non-earthed socket:

• Connect the “earthing wire” to the copper plate and bury it at a depth of at least 25 cm in the ground.

The appliance must be positioned so that the plug is accessible after installation.

LEVELLING

If the front of the appliance is slightly higher than the rear, the door can be opened and closed more easily.

The appliance tilts down to the left.

Turn the left adjusting leg in the direction of the arrow with a flat head screwdriver until the appliance is level.

The appliance tilts down to the right.

Turn the right adjusting leg in the direction of the arrow with a flat head screwdriver until the appliance is level.

4

Page 5
Image 5
Samsung SG627EPNSQ/SML, SG627ECSWQ/SML, SG627EPSHQ/SML, SG627EVNBQ/SML manual Installing the REFRIGERATOR/FREEZER, Levelling