Installation

The docking station must be plugged in and turned on at all times.

Power lamp (Red)

(ONLY SR20J90✴✴U Series)

Install the docking station in a place without obstacles and danger of falling.

m 1 About

About 0.5 m

DC-IN

About 0.5 m

DC-

IN

Connect the

Connect the

Connect the

1adapter jack

2power cord to

3power plug to

to the docking

the adapter

the outlet

station

When using the adapter,

The power indicator lamp

 

the side with the sticker

(Red) will turn on.

 

attached must face down.

 

ENGLISH-08

Page 8
Image 8
Samsung VR20J9010UG/SP manual Installation