1.Identify the Front Stabilizer (2). While another person lifts the front of the Frame (1), attach the Front Stabilizer to the Frame with two M10 x 112mm Carriage Bolts (65) and two M10 Black Nylon Locknuts (63). Make sure that the Front Stabilizer is turned so the Wheels (30) are not touching the floor.

2.While another person lifts the rear of the Frame (1), attach the Rear Stabilizer (3) to the Frame with two M10 x 112mm Carriage Bolts (65) and two M10 Black Nylon Locknuts (63).

3.While another person holds the Upright (13) in the position shown, connect the Upper Wire Harness (36) to the Lower Wire Harness (35). Carefully pull the upper end of the Upper Wire Harness to remove any slack from the Wire Harnesses; make sure that the connectors do not catch on the indicated rod.

Turn the indicated Adjustment Knob (28) counterclock- wise two or three turns to loosen it. Next, pull the Knob, insert the Upright (13) into the Frame (1), and then release the Knob. Be careful to avoid pinching the

Wire Harnesses (35, 36). Move the Upright up and down slightly until the pin on the Knob snaps into one of the holes in the Upright. Then, turn the Knob clockwise until it is tight.

Tighten the M6 x 25.4mm Button Screw (33) into the Frame (1) and into the slot in the side of the Upright (13).

Attach the Water Bottle Holder (9) to the Upright (13) with two M4 x 22mm Screws (21).

1

 

30

 

65

 

30

 

2

 

 

1

 

63

2

63

 

 

3

63

 

1

 

 

65

3

 

 

Make sure the

 

wire harnesses

 

do not get

9

pinched and

damaged during

 

this step.

 

21

13

 

Rod

 

Slot

 

1

 

36

28

 

35

 

33

 

6

Page 6
Image 6
Sears 831.283120 user manual Make sure, Wire harnesses, Do not get, This step