To measure the hourly rate of operation

1Use the stopwatch to measure the time required to complete 1 job.

2Tachymeter scale indicated by STOPWATCH second hand gives the average number of jobs ac- complished per hour.

Ex. 1

 

5

STOPWATCH

 

30

 

25

 

second hand:

20

10

 

20 seconds

 

MIN.

Tachymeter scale: “180”

“180” (tachymeter scale figure) x 1 job = 180 jobs/hour

English

Ex. 2: If 15 jobs are completed in 20 seconds:

“180” (tachymeter scale figure) x 15 jobs = 2700 jobs/hour

15

Page 15
Image 15
Seiko 7T32 manual To measure the hourly rate of operation