Servis-Rhino 4211SS manual Operation, Hauling the Tractor and Implement

Models: 4211 4211SS

1 104
Download 104 pages 9.72 Kb
Page 88
Image 88
10.2 Hauling the Tractor and Implement

OPERATION

OPERATION

10.2 Hauling the Tractor and Implement

Before transporting a loaded tractor and implement, measure the height and width dimensions and gross weight of the complete loaded unit. Ensure that the load will be in compliance with the legal limits set for the areas that will be traveled through. OPS-U- 0024

Use adequately sized and rated trailers and equipment to transport the tractor and implement. Consult an authorized dealer to determine the proper equipment required. Using adequately sized chains, heavy duty straps, cables and/or binders, securely tie down both the front and rear of the tractor utilizing the proper tie down locations as specified by the tractor manufacturer. OPS-U- 0025

4211-4211SS 01/11

Operation Section 4-42

© 2011 Alamo Group Inc.

Page 88
Image 88
Servis-Rhino 4211SS manual Operation, Hauling the Tractor and Implement