SharkRack Enclosure Installation Guide

WARNING (CONT.):

Plug cabinet power cords into electrical outlets that are located near the cabinet and are easily accessible.

Connect all devices installed in a rack to power devices installed in the same cabinet. Do not plug into a power device installed in a different cabinet.

Check the equipment power rating before plugging into a cabinet power device. Check that both the voltage range and current draw are within the limitations of the power device. The voltages of the power device receptacles are typically equal to the voltages of the UPS or AC source.

To avoid overloading, check the total input current rating of the equipment being connected to a power device to ensure that it does not exceed the maximum rating of the power strip or any UPS to which it may be connected.

Each installed server or other device might have more than one power cord. Be sure to disconnect all power cords in the cabinet before servicing any device in the cabinet.

CAUTION:

Removing components from the top portion of the rack improves cabinet stability during relocation. Follow these general guidelines whenever you relocate a populated cabinet within a room or building:

Reduce the weight of the rack by removing equipment starting at the top of the rack. When possible, restore the cabinet to the configuration as you received it. If this is not possible or the configuration is unknown, remove all devices in the 11U position and above before moving the cabinet.

Inspect the route that you plan to take and eliminate any potential hazards.

Verify that the route that you choose to move the rack cabinet can support the weight of the loaded rack cabinet, which may exceed 2500 lbs.

Verify that all doorways can accommodate the cabinet. Ensure that all devices, drawers, doors, and cables are secure. Ensure that all leveling feet are raised to their highest position. Ensure that the floor mounting brackets are removed (see Figure 6).

Once the cabinet is in its new location, repopulate the cabinet from the lowest position to the highest position.

If long distance relocation is required, pack the cabinet in the original packaging material, or equivalent. Also, use the floor mounting brackets to bolt the cabinet to the pallet.

ID-00210-000

REV D, ECO2773

Page 5 of 46