SharkRack Enclosure Installation Guide
Chapter 1 Site Preparation
Check Facility Provisions
Ensure that the following conditions are met:
•Floor is level and of sufficient strength to support the rack and your equipment. At maximum gross weight, the floor must be able to support 1000 lb/in2.
•A qualified professional should complete site electrical power supply
•Check with a qualified HVAC technician to make sure the environment will support the heat load of the products being installed in the cabinet.
•Select a location for the cabinet that will allow adequate space for the door to open freely and
•Check that the site can accommodate the cabinet footprint and mounting locations according to the illustrations in Figure 3 and Figure 4.