Baffle Installation
1.Determine which baffle to use. See Figure 3 Chart.
2.Lift side discharge chute (H, Figure 3).
3.Insert baffle (F) through discharge opening and posi- tion baffle into place.
4.Tighten carriage bolts (A) and nuts (E) on baffle (F).
5.Tighten carriage bolt (B) and nut (E) on baffle (F).
6.Position baffle (G) into place.
7.Tighten carriage bolts (C) and nuts (E) on baffle (G).
8.Tighten carriage bolts (D) and nuts (E) on baffle (G).
H
E
A
A. Carriage Bolts,
B. Carriage Bolt, | E | |
E | ||
| ||
C. Carriage Bolts, | F | |
| ||
D. Carriage Bolts, | B | |
| ||
E. Locknut, |
| |
F. Right Hand Baffle |
| |
G. Left Hand Baffle | G | |
H. Discharge Chute |
|
Tube Component Assembly
| 44” Mower Deck | 50” Mower Deck |
|
|
|
“A” | RH side | RH side |
|
|
|
“B” | LH side | LH side |
|
|
|
“A”
“B”
C |
| |
E | D | |
E | ||
|
Figure 3. Baffle Assembly
5