Smeg SNZ106VML manual Instructions for the installer, Installation Of The Appliance

Models: SNZ106VML

1 24
Download 24 pages 24.86 Kb
Page 18
Image 18
Instructions for the installer

Instructions for the installer

15.INSTALLATION OF THE APPLIANCE

It is the law that all gas appliances are installed by authorised persons. Clearance around the cooker must comply with the requirements of AS5601.

15.1 Electrical connection

Make sure that the power line voltage matches the specifications indicated on the rating plate located inside the storage compartment.

This rating plate must never be removed.

On the power line, install a two-pole cut-off device with contact cut-off distance greater than or equal to 3 mm, located in an easily accessible position near the unit.

For operation on 220-240V : use an H05RR-F /H05RN-F /

H05V2V2-F (3 x 2.5 mm2 on 90 cm models - 3 x 1.5 mm2 on 60 cm models)

For operation on 380-415V2N (only for 90 cm models): use an H05RR-F /H05RN-F /H05V2V2-F type five-core cable (cavo di 4 x

1.5 mm2)

For operation on 380-415V3N (only for 90 cm models): use an H05RR-F /H05RN-F /H05V2V2-F type five-core cable (5 x 1.5 mm2).

The cable end to be connected to the appliance must be provided with an ground wire (yellow-green) at least 20 mm longer.

The manufacturer declines all responsibility for damage to persons or things caused by non- observance of the above prescriptions.

Overall dimensions: location of gas and electrical connection points (all measures in mm).

A

100

B

580

C

150

D

150

 

 

20

Page 18
Image 18
Smeg SNZ106VML manual Instructions for the installer, Installation Of The Appliance, Electrical connection